Home » Showcase » Analysis Study of MSW Management to Produce Energy with the Capacity 800 tpd at On-Nut MSW Disposal Center Analysis Study of MSW Management to Produce Energy with the Capacity 800 tpd at On-Nut MSW Disposal Center Post navigation Next » « Prev Source of Funding: The Krungthep Thanakom Co., Ltd. Budget: - Time Duration: 2017 Status: Completed More from my siteConsultancy for the Feasibility Study of MSW Management by Incineration Technology with the Capacity of not less than 2,000 tpd at Nhong Khaem MSW Management CenterConsultancy for Feasibility Study of MSW Disposal by Using Bio-Mechanical Technology (Sorting, Composting and Energy Production), amount 4 ProjectsConsultancy for Feasibility Study of MSW Disposal by Incineration System with the Capability 1,000 tpd at On-Nut and Nhong-Khaem Disposal CenterStudy and Design for the MSW Disposal Center by The Complete Incineration on Koh Lan Island AreaFeasibility Study of Producer Gas Production from Palm Empty Fruit Bunch by Using Gasification ProcessFeasibility Study of the Development of the Integrated Waste Management Center, Chonburi